What moving from Manhattan SCALE to ActiveWarehouse (MAWM) involves, from auditing years of SCALE configuration to a site-by-site rollout.
By Sharon Bondhus, Manhattan Practice Lead at Bricz·Updated November 2026
Where Manhattan SCALE stands today
Manhattan SCALE is a Microsoft-based WMS built for mid-sized businesses. Many SCALE customers are hosted in Manhattan’s Azure cloud, and new releases still arrive annually on-premise or quarterly in the cloud.
Teams moving on from SCALE go to ActiveWarehouse, Manhattan Active® Warehouse Management (MAWM). The work starts with SCALE’s accumulated configuration: MOCA scripts, custom extensions and edge-case logic.
Targeted at the commercial segment; many customers hosted in Manhattan's Azure cloud
Microsoft-based architecture
New releases annually on-prem or quarterly in cloud
Why SCALE teams move to MAWM
These are the reasons Bricz customers give for moving to Manhattan Active® Warehouse Management.
No more upgrades. Updates arrive continuously, and new functionality is included with the subscription.
Security without downtime. Aging on-premise infrastructure can’t always be patched. In the cloud, security patches and code updates need no downtime.
Lower infrastructure cost. No servers to buy, run and maintain.
One platform. Warehouse management, labor management, slotting and SCI reporting work together on one platform.
Scalability. Capacity follows system load, so the platform grows with the business.
Open APIs. An API-based design adds agility and makes integration and extension simpler.
Support. Older versions have shrinking pools of support resources.
How a SCALE to ActiveWarehouse migration works
Years of configuration expertise, carefully translated.
SCALE's configurability accumulates over time — MOCA scripts, custom extensions, edge-case logic. We surface all of it first, then decide what to translate, replace, or retire before ActiveWarehouse design begins.
How Bricz migrates it
Configuration audit. We inventory your full SCALE environment: scripts, integrations, and wave and labor rules.
Translation & design. Each piece of custom logic gets a disposition — native config, replacement, or rebuild — driving the AW design.
Migration & go-live. We migrate data at volume and run a site-by-site rollout, stabilizing each site before the next.
Who does what
Manhattan owns the platform-side workstreams; Bricz and your team own everything around them.
Manhattan
Design translation and fit/gap analysis
Hardware analysis
Configuration migration
Labor Management — Productivity Tracking
Integration Migration (if using MIF)
Migration of Critical SCI Reports
Migration of required extensions
4-wall Systems Integration Testing (SIT) & Continuous Workflow Validation (CWV)
Creation of End User Training materials
Bricz and your team
Program management over all integrated systems
Business process design decisions & sign-off
SOP creation
Master & transactional data cleansing and provisioning
A move from SCALE is a new implementation, so the first site follows the same timeline as any ActiveWarehouse project.
Template-led first site
From 6 months
Complex facility
Up to 18 months
061218 months
Template-led sites can be live in as little as six months for the first site.
More complex facilities can take up to 18 months.
Every site after the first rolls out significantly faster, and sites can be brought live in parallel.
What to watch for
The same few problems derail most moves to MAWM. Here is what the Bricz Manhattan practice sees, and what it does about each.
What goes wrong
Treating a move to MAWM as an upgrade instead of a rip-and-replace, and underestimating the effort.
What Bricz does
Bricz plans a customer moving from an older version exactly like a new customer. Both are new implementations.
What goes wrong
Keeping operations as-is instead of adjusting SOPs to fit the platform’s functionality.
What Bricz does
Bricz pushes to reduce extensions and suggests small operational changes that deliver the same result.
What goes wrong
Too little testing, on timelines that are too short.
What Bricz does
When you think you have tested enough, test some more. Bricz sets realistic time for testing and defect resolution.
What goes wrong
Underestimating the integration effort.
What Bricz does
MAWM is a very open system, but the lift from a legacy version is significant. Bricz sets realistic timelines for all integration testing, from host interfaces to automation.
Bricz inventories every script, extension and rule first. Each one then gets a disposition: native ActiveWarehouse configuration, a replacement, or a rebuild. That decision drives the ActiveWarehouse design.
No. Bricz plans a move from SCALE exactly like a new implementation. Treating it as an upgrade is the most common reason teams underestimate the effort.
Customers who can follow a template can be live in as little as six months for the first site, while more complex facilities can take up to 18 months. Later sites roll out significantly faster and can run in parallel.
Yes. SCALE still receives new releases annually on-premise or quarterly in the cloud.
Plan your move from SCALE
Bricz has delivered 120+ Manhattan implementations since 2013. For the bigger picture across every Manhattan platform, see the Manhattan WMS guide.